The following enhancements have been made to docker/docker-compose
* Fixed bug when building the image.
* docker-compose up starts the server
* Scaffolding inside the container respect the ownership of the files
outside it
* Volumes are tagged as 'delegated' in order to improve performance for
mac/windoze users.
* bundler stores packages in a volume. This whay new packages can be
added without rebuilding the image:
```bash
docker-compose run app bundle install
```
Add feature spec to test if the 'Calculate winners'
button is enabled or not, depending on the phase.
It also checks the message that clarifies why the
button is disabled.
Regarding the feature ‘Carousel size’:
There is no need to test styling in specs, it changes too often
There are nice ways to test it, but it seems a little too much right
Review later on
Note there is some funkiness going on with class loadings
Had to create a `feed` and `widget_feed` table even though in this
first version the Widget::Feed includes only uses ActiveModel instead
of ActiveRecord, otherwise some specs failed
We’ll figure it out and clean up 😌
Why:
Sometimes the latitude or longitude it passed to the map as *********
instead of the actual latitude or longitud. The asterisks are not a
string, breaking the whole array
https://github.com/consul/consul/issues/2380
What:
This commits skips invalid markers and displays the rest
How:
- Substituting the mysterious asterisks for null
(cleanInvestmentCoordinates)
- Validating the coordinates are numbers before trying to pain
them(validCoordinates)
- Adding a numeric function to validate the latitude and longitude
(isNumeric)
https://stackoverflow.com/questions/9716468/is-there-any-function-like-i
snumeric-in-javascript-to-validate-numbers#answer-9716488
Move the button so that it appears in the Winners tab of the
budget_investments index.
When the budget is in "Balloting projects", "Reviewing Ballots"
or "Finished budget" phases, the button will appear as a button
(clickable). If there are no winners calculated yet, the text
will be "Calculate winner investments"; if there are, the text
will be "Recalculate winner investments".
If the budget is in another phase, the button will be
disabled and a message will appear: 'The budget has to stay on
phase "Balloting projects", "Reviewing Ballots" or
"Finished budget" in order to calculate winners projects'